§ 18-69. Sanitary sewer system.  


Latest version.
  • (a)

    The subdivider shall construct a sanitary sewer system to serve the proposed subdivision and every lot within the proposed subdivision.

    (b)

    The subdivider's engineer shall conform to the recommendations of the city manager in the design and layout of the sanitary sewer system.

    (c)

    Manholes shall be spaced in the sewer lines at every junction and angle point.

    (d)

    The terminus of all sewer lines must be provided with a "clean-out" or manhole.

    (e)

    All material and installations shall be in accordance with city standards for same.

(Ord. of 1-19-81, Art. 5, § 4)